Al Maha Industries / Warehouse insights Checklist

12 things to inspect before signing a warehouse lease

A site visit is your best chance to avoid expensive surprises. Take this checklist with you and ask for each item in writing before you sign.

The building

  1. Clear height. Measure from the floor to the lowest obstruction, not to the roof peak. This sets how many racking levels you can use.
  2. Floor condition and load. Look for cracks and uneven areas, and ask what floor loading the slab is designed for if you will use heavy racking or machines.
  3. Doors and loading. Check the size of the shutter door and whether trucks can turn and reverse easily in front of it.
  4. Mezzanine or office space. Confirm whether one exists or can be added, and who pays for it.

Services

  1. Electrical capacity. Ask for the supply in kVA and whether it is three-phase. Compare it with your equipment list.
  2. Water and drainage. Essential for food, cleaning and some production processes.
  3. Fire safety. Check sprinklers or fire systems, extinguishers and that the unit holds a valid civil defence approval.
  4. Ventilation and cooling. Ask what is allowed if you plan to add air conditioning or cold rooms.

Location and access

  1. Roads and travel time. Drive the route at the hours your trucks will use it.
  2. Parking and security. Staff parking, visitor access, gates and CCTV.

Costs and contract

  1. What the rent includes. Confirm the rent basis (per sq ft per year), service charges, security deposit and who pays for utilities and maintenance.
  2. Licensing and permitted use. Make sure your trade licence activity is allowed in the unit and the area before you commit.

Want to see a brand-new unit with 10 m height and 125 kVA power? Book a site visit at Al Maha and bring this list with you.

Ready to talk about your space?

Not sure what size or power you need?

Talk to our team. A free consultation, no sales pressure.